EYEFIYFACTORY NOTES — QC
QC notes
Every note where our inspection caught what would otherwise have shipped: the held batches, the counted-out rejects, the rules that now exist because a claim once did.
Both high, or both low A batch came in with its endpieces set at different heights. Both endpieces high passes. Both low passes. One of each does not, because the line is drawn on whether left matches right, not on the height itself. WENZHOU — HENRY Two rivets, not one Three metal logos fell off a 600-unit order. The cause was one rivet where the bend needs two — a few cents of savings against a four-figure claim. OUHAI — HENRY The wrong production line An order spec'd at the factory's highest grade came off its volume line. Of roughly 1,600 frames inspected, three to four hundred were clean. The batch did not ship as it stood. WENZHOU — HENRY
If these problems sound like the ones your orders keep hitting, that is not a coincidence.
They are the standard failure modes of this industry. Absorbing them is the job.